What are the main methods for pressure reduction instrument alarm?
(1) Reduce on-site instrument and system failures, promptly handle faults, and perform preventive maintenance and reliability improvement.
(2) Signal processing and control loop optimization, filtering of I/O signals, setting of signal thresholds and dead zones, tuning of PID parameters, and optimization of control strategies.
(3) Improve the system's self-control and stability, ensuring the stability of the control circuit, process parameters, and equipment.
(4) Instrument health status warning and setting, gradually improving the section and device warning models.
(5) Continuous optimization, through alarm analysis and statistics, alarm parameter setting design, cancellation of duplicate alarms, continuous optimization of alarm grading and models, alarm lifecycle, full process, closed-loop management, and training, to institutionalize alarm management.
What are the main contents of 2DCS network security design?
The DCS network security design should adopt a combination of hardware and software, and provide a platform environment for real-time detection of DCS networks. Through specific security policies, abnormal events, illegal operations, and real-time alarms that occur in the system should be identified and recorded. The main content includes:
(1) Set up a bypass detection platform.
(2) Real time network parameter detection, such as network traffic, access quantity, abnormal event recording, and unknown device access, to monitor network operation status.
(3) Visualize network parameters, such as network topology, network operating parameters, event records, and alarm information.
(4) Network security audit, in accordance with security audit requirements, provides content audit, traffic audit, and behavior audit related to activities in the network, and generates complete audit records.
What are the main contents of 3DCS inspection?
(1) Preparation and parking confirmation before system shutdown - personnel, tools, site, plan, data backup, etc.
(2) System dust removal work.
(3) Hardware equipment inspection and testing - a comprehensive functional inspection and testing of I/O channels, modules, workstations, networks, etc.
(4) Replace vulnerable components such as filters, batteries, fans, etc.
(5) Comprehensive testing of system inspection - using professional software and calibration instruments to conduct a comprehensive inspection of clock, communication, memory, keyboard, indicator lights, interfaces, etc.
(6) Inspection and testing of power supply system.
(7) Grounding system inspection and testing.
(8) Submit inspection (service) report.
How to do dust removal work in 4DCS inspection?
(1) Power off the system step by step according to the nodes.
(2) On the premise of doing a good job in anti-static, remove the dust removal objects one by one and place them at the designated construction site for blowing operations.
(3) Use a hair dryer or instrument air to perform preliminary treatment on the dust removal object.
(4) Thoroughly remove residual dust with a brush.
(5) Clean the circuit board with cleaning agent.
(6) Clean the rack and cabinet with a vacuum cleaner, hair dryer, and cotton cloth.
(7) Reinstall the cleaned modules and equipment.
(8) Restore all hardware and connecting components to their original positions and states.
What are the main contents of the 5DCS inspection report?
(1) Make a written inspection report on the results of system inspection and testing, including: system inspection records; Real time printing report for software comprehensive testing; Power supply system inspection and testing report; System grounding inspection and testing report; System communication network inspection report; Report on the overall performance status of the system, as well as the weak links (hidden dangers) and test results of the system.
(2) Propose improvement measures and suggestions, and provide solutions to the problems and hidden dangers of the system to ensure its normal and safe operation in the next maintenance cycle, laying a solid foundation for future maintenance work.